How Legalizing an Unpermitted ADU or Garage Conversion Works

A plain-language look at the steps that typically lead from an unpermitted ADU, garage conversion or addition to a permit in California, who does what at each stage, and what to have ready before you call.

The free initial conversation is a starting point. Detailed research, drawings and project services are quoted separately. Monday–Friday, 9am–6pm PT.

Important: Every legalization project is different. The specific steps, professionals required, timeline, and costs depend on the property, structure, zoning, and reviewing jurisdiction. This overview describes the general process — individual review is needed to understand what will apply to your specific situation.
The Process

The General Process in Six Steps

Most legalization projects follow the same general path. Bryce Keller, who has more than 20 years of residential design experience, guides homeowners through it: documenting what exists, preparing drawings and permit plans, preparing and submitting permit applications, and coordinating plan-check responses within the agreed scope.

01
Initial Property Review

A free initial conversation with Bryce about the property: what was built, when, and whether you have a city notice or deadline. You learn the likely next steps and what information would help.

02
Permit and Records Research

Researching the permit history and records for the address to see what the agency has on file and which agency reviews the property. Detailed research is quoted separately.

03
Feasibility Assessment

Comparing what was built with zoning and building requirements to understand whether legalization looks feasible, whether a state-law path such as AB 2533 may apply, and what corrections might be needed. No outcome can be promised.

04
As-Built Documentation and Plans

Measuring and documenting what exists, then preparing existing-condition (as-built) drawings and permit plans within the agreed scope.

05
Professional Coordination

When a licensed architect, engineer or contractor is needed, for example for engineering or to carry out corrections, we help identify and coordinate with a qualified professional. Their fees are separate.

06
Permit Submittal and Follow-Through

Preparing and submitting the application to the reviewing agency, following up on it, and coordinating responses to plan-check corrections. The agency makes the approval decision.

Who Does What

Three Parties, Three Different Roles

ADU Legalization and Bryce

Talks through your situation, coordinates records research, prepares existing-condition drawings and permit plans, prepares and submits permit applications, and coordinates with the building department on plan-check responses, within the agreed scope. ADU Legalization is not a law firm, and Bryce is not a licensed architect, engineer or contractor.

The reviewing agency

The City of Los Angeles Department of Building and Safety, LA County, or another city or county building department reviews the submittal, issues corrections, sets fees and performs inspections. Approval is the agency’s decision.

Licensed professionals and contractors

If the project needs an architect, engineer or contractor, we help identify and coordinate with a qualified one. Their work and fees are separate from ADU Legalization’s services.

Your Situation

Where the Process Differs

The six steps stay the same, but the details change with what you have. These pages explain each situation:

Time and Cost

How Long Does It Take, and What Does It Cost?

Timing depends on how complete the records are, the agency’s review schedule, how many rounds of corrections are issued, whether other departments must clear items such as sewer or fire access, and how quickly corrections are answered and inspections scheduled. No timeline can be promised. See how long legalization takes.

Cost has several separate parts. ADU Legalization’s research, drawing and project services are quoted by project scope after the free initial conversation. City and county fees, licensed professionals and any construction to correct deficiencies are separate. See pricing and service scope and the Los Angeles cost breakdown.

Before You Call

What to Have Ready for the First Conversation

  • The property city (a street address is not needed to request a callback).
  • The approximate date the unit or conversion was built, if you know it.
  • What it is used for now, such as a bedroom, den or rental unit.
  • Any permits, plans, photos, or correction or violation notices, with deadlines.
  • Any sale, refinance or city deadline.

Talk to Bryce about your property

Start with a free initial conversation. Detailed research, drawings and project services are quoted separately.

Call Bryce: 310-570-2885Request a Free Initial Conversation →
FAQ

Questions About the Legalization Process

What is the first step to legalize an unpermitted ADU or garage conversion?

Start with a conversation about the property: what was built, when, and whether you have a city notice or deadline. Permit and records research then shows what the agency has on file and which agency reviews the property. The initial conversation with Bryce is free.

Are as-built plans always required?

Usually the reviewing agency needs drawings of what exists, but the requirements depend on the agency, the property and the permit path. For some pre-2020 units in the City of Los Angeles, LADBS describes a streamlined path built around proof of the construction date and a site plan rather than a full set of construction plans. The agency decides what it accepts.

Will I have to remove or tear out the unpermitted work?

Not necessarily. Many unpermitted conversions are brought into compliance through corrections rather than removal, but this depends on the property, how the work was done, zoning and the agency's requirements. Not every unit can be legalized as it is.

Does AB 2533 apply to my unit?

It may apply to an ADU or junior ADU built before January 1, 2020. For a qualifying unit it limits the reasons a permit can be denied, but health and safety corrections are still required, and not every converted garage qualifies. See the AB 2533 guide for details.

Who approves the permit?

The reviewing agency, such as the City of Los Angeles Department of Building and Safety or a county or city building department, approves permits, issues corrections and performs inspections. ADU Legalization coordinates documentation, submittals and plan-check responses within the agreed scope but does not approve permits and cannot guarantee an outcome.

How long does legalization take and what does it cost?

Both depend on the property and the agency, so no single timeline or price applies. The initial conversation is free. Research, drawings and project services are quoted separately, while city or county fees, licensed professionals and construction are separate costs.

Official Resources

Where Requirements Are Set

Requirements come from the agency that reviews your property, so confirm them with that agency. Useful starting points: