Legalizing an Unpermitted JADU
A junior accessory dwelling unit (JADU) is a small unit inside an existing home. We help you understand the rules and prepare, submit and coordinate the permit application.
What a JADU is and how legalization works
Who this is for
- Owners of a bedroom, attached garage or other space inside the house that was turned into a small separate unit without permits
- Buyers who found a JADU that is not on the permit record
- Owners deciding whether the unit is a JADU, an ADU or a garage conversion
What state law says a JADU is
According to the HCD ADU Handbook (March 2026), a JADU is a unit of no more than 500 square feet of interior livable space, contained entirely within a single-family residence (Government Code § 66333; definition at § 66313(d)).
- Location: within the walls of an existing or proposed single-family home. An attached garage counts as part of the residence, so a JADU can be created from one. A JADU is not allowed in a detached accessory structure, and not on a multifamily site. One JADU is allowed per lot with a single-family home.
- Kitchen: an efficiency kitchen, with cooking appliances, a food-preparation counter and storage cabinets of reasonable size for the unit.
- Bathroom: the JADU may have its own bathroom or share one with the main home.
- Owner occupancy: if the JADU shares sanitation facilities with the main home, the owner must live in either the JADU or the main home. If it has its own bathroom, owner occupancy is not required.
- Other rules the handbook lists: a deed restriction that prevents the JADU from being sold separately, no required parking, and rentals longer than 30 days.
How these rules are applied to a unit that already exists is for the reviewing department. Local ordinances can add detail, so we confirm your city’s requirements first.
AB 2533 and unpermitted JADUs
The HCD Information Bulletin 25004 says AB 2533 extends the ADU amnesty law to unpermitted ADUs and JADUs built before 2020. The HCD handbook notes the former Government Code § 66332 is now § 66311.7. For a qualifying unit, a city or county generally may not deny a permit for building or zoning violations unless correcting them is necessary to protect health and safety. The unit must still be permitted, corrected where needed and inspected. Dated proof of when it was built (assessor records, leases, receipts, disclosure documents) helps. See our AB 2533 guide.
Los Angeles example: LADBS bulletin P/BC 2026-161 lists an attached JADU among the work descriptions for its streamlined AB 2533 process and requires a 1-hour fire-resistance-rated wall between an attached unit and the main home. Other cities have their own procedures.
JADU, ADU or garage conversion?
A JADU is inside the main house. A unit in a separate building such as a detached garage or guest house is not a JADU, but it may be an ADU: see ADU legalization and guest house legalization. A garage converted into living space may be a JADU if the garage is attached to the home: see garage conversion legalization.
What we do
- Help you work out how your unit is likely to be classified and what your city requires
- Prepare existing-condition drawings, permit plans and project documentation for the JADU
- Prepare and submit the permit application
- Communicate and coordinate with the building department, respond to plan-check corrections and coordinate revisions
- Tell you which plans and documents the department lists, so you know what remains
What to gather
- Address and what the space was before the conversion
- Dated proof of when the unit was built, if you have it
- What the unit has today: kitchen, bathroom, entrance, utilities
- Any plans, permits, photos or city notices
What is separate from our service
The department reviews the application, sets fees, inspects and decides on approval. Licensed contractors do construction corrections, and a licensed architect or engineer is separate if one is required. We do not guarantee approval, an inspection result or a certificate of occupancy. This page is general information and not legal advice.
After you contact us
Send the short form or call 310-570-2885 (Monday–Friday, 9am–6pm PT). We will be in touch as soon as possible, ask a few questions about the property and the work, and tell you whether a review makes sense. If you have a city notice, mention the deadline. If paid work makes sense, you receive the scope in writing; see Pricing for what is quoted separately. Services are available throughout California. Every city and county has its own requirements, so we confirm the reviewing department for your address first.
Source information reviewed November 2026. Agencies update bulletins, forms and hours, so confirm current requirements with the reviewing department before you rely on them. This page is general information, not legal or professional advice.
Related services and guides
- ADU legalization
- Garage conversion legalization
- Guest house legalization
- As-built plans
- Permit submittal coordination
- Guide: AB 2533 and unpermitted ADUs
- Blog: JADU legalization guide
- Blog: owner-occupancy requirements
- How it works
- Pricing
Working in the Los Angeles area? We have local permitting pages for Sherman Oaks, Studio City, Los Angeles, Glendale, Pasadena and Burbank. Properties in other California cities follow their own building department’s process; see all service areas.
Talk through your project
ADU Legalization can help you understand your situation and coordinate the next steps for your California property.
Request a Property Review →The first conversation is free. See what is quoted separately and why scope varies.
See Pricing →Serving Property Owners Across California
JADU Legalization assistance is available to property owners throughout California. Find your location below.
Common Questions
A junior accessory dwelling unit is a unit of no more than 500 square feet of interior livable space, contained entirely within a single-family residence, according to the HCD ADU Handbook.
Yes. The HCD handbook says an attached garage counts as part of the residence, so a JADU can be created from one. A JADU is not allowed in a detached accessory structure.
If the JADU shares a bathroom with the main home, the owner must live in either the JADU or the main home. If the JADU has its own bathroom, owner occupancy is not required.
HCD says it extends the amnesty to unpermitted ADUs and JADUs built before 2020. The unit must still be permitted, corrected where needed and inspected, and approval is not automatic.
Yes. We prepare the plans and documents, prepare and submit the application and coordinate with the building department. The department decides on approval.
It depends on the unit and your city’s fees. The first conversation is free, and the scope is given in writing before paid work begins. See Pricing.
Not sure where your property stands?
Tell us about the property and the work. We will be in touch as soon as possible.
Request a Property Review → Call 310-570-2885