Retroactive Building Permits

Work was finished before a permit was pulled? A retroactive permit asks the city to review and inspect what already exists. Here is how the process usually goes.

Retroactive permits

Getting a permit for work that is already built

Short answer: A retroactive permit (also called an as-built permit or permit after the fact) is the regular permit process applied to work that was done first. The building department reviews plans, may require corrections, and inspects the work. Some departments add fees or extra inspections for unpermitted work. Approval is the department’s decision and is not guaranteed.
Who does what: Bryce, a Residential Designer & Project Manager with 20+ years of residential design experience prepares existing-condition drawings and permit plans, prepares and submits permit applications, and coordinates with the building department on plan-check responses, within the agreed scope. The reviewing building department decides on approval. ADU Legalization is not a law firm, and Bryce is not a licensed architect, engineer or contractor.

Who this is for

  • Owners of unpermitted ADUs, garage conversions, additions, bedrooms, bathrooms or other improvements
  • Buyers and sellers who need unpermitted work resolved
  • Owners who received a notice, stop-work order or correction notice

The usual process

  1. Research. Find out what permits exist and which department reviews your address (see permit research).
  2. Existing-condition plans. Measure and draw what exists (see as-built plans).
  3. Review of code and zoning questions. Identify what the department is likely to ask about, and when a licensed architect or engineer may be needed.
  4. Submittal. Apply to the building department with the plans and forms it requires.
  5. Plan check. The department may issue corrections; we help organize responses (see plan-check coordination).
  6. Inspections. Inspectors verify the work. They may ask to see inside walls, ceilings or crawl spaces, and may require corrections.
  7. Final. When the department signs off, the permit is finaled.

What may add to the cost or time

  • Extra permit or penalty-type fees some departments charge for work done without permits; the department sets them
  • Corrections to electrical, plumbing, egress, fire safety or energy items that do not meet current requirements
  • Opening finished surfaces so an inspector can see the work
  • Structural review if the work changed the framing or foundation

If it is an ADU built before 2020

AB 2533 (Government Code § 66311.7, formerly § 66332) may apply to an unpermitted ADU or JADU built before January 1, 2020. It limits certain reasons for denial but still requires health and safety corrections, and it is not automatic approval. It does not cover other kinds of unpermitted work. See the HCD ADU Handbook and our AB 2533 guide.

What to gather

  • Address, what was built, and roughly when
  • Any plans, receipts, photos or contractor information
  • Any notice, with its deadline and case number

What is separate from our service

The department reviews, sets fees, inspects and approves. Licensed architects, engineers and contractors are separate professionals when required. ADU Legalization is not a law firm, and Bryce is not a licensed architect, engineer or contractor. We help coordinate; we cannot promise a permit will be issued or how long review will take.

After you contact us

Send the short form or call 310-570-2885 (Monday–Friday, 9am–6pm PT). We will be in touch as soon as possible, ask a few questions about the property and the work, and tell you whether a review makes sense. If you have a city notice, mention any deadline on it. If paid work makes sense, you receive the scope in writing; see Pricing for what is quoted separately.

Related services and guides

Working in the Los Angeles area? We have local permitting pages for Sherman Oaks, Studio City, Los Angeles, Glendale, Pasadena and Burbank. Properties in other California cities follow their own building department’s process; see all service areas.

Talk through your project

ADU Legalization can help you understand your situation and coordinate the next steps for your California property.

Request a Property Review →
Service Areas

Assistance is available throughout California.

View All Service Areas →
How It Works

Learn about the general legalization process and what to expect.

Learn the Process →
What it costs

The first conversation is free. See what is quoted separately and why scope varies.

See Pricing →
Retroactive Building Permits by Location

Serving Property Owners Across California

Retroactive Building Permits assistance is available to property owners throughout California. Find your location below.

View all California service areas →

FAQ

Common Questions

Will the inspector need to see inside the walls?

LADBS says that, at the inspector’s discretion, covered or concealed work may need to be exposed for examination during inspection under its AB 2533 process, and that items that do not meet the standards are documented and issued as corrections. Other departments set their own rules.

What is a retroactive building permit?

It is a permit obtained after the work was already done. The city reviews plans of the existing work, may require corrections, and inspects. Some people call it an as-built permit.

Will the city fine me for unpermitted work?

That depends on the city and the circumstances. Some departments charge additional fees for work done without permits, and a notice may set deadlines. Ask the reviewing department about its rules. For qualifying pre-2020 ADUs, AB 2533 limits penalties.

Do inspectors have to open the walls?

They may ask to see concealed work, such as framing, wiring or plumbing. What they require is their decision, and photos or other documents are sometimes accepted.

How long does a retroactive permit take?

It varies with the department’s review times, the complexity of the work and how many corrections are issued. We cannot predict a timeline before reviewing the project.

Can every unpermitted structure be permitted?

No. Zoning, safety and code limits may prevent approval of some work as built. A review of the records and the structure shows what is realistic.

What does it cost?

It depends on the project and the city’s fees. The first conversation is free; see Pricing for what is included and what is quoted separately.

Not sure where your property stands?

Tell us about the property and the work. We will be in touch as soon as possible.

Request a Property Review → Call 310-570-2885